
Add to Cart
T1 3 Pole AC SPD 280V Lightning Surge Protection Surge Protective Device 4P
Product Description
Surge protection device to prevent lightning surge voltage in low-voltage electrical system or solar energy system (photovoltaic power supply system). These devices must be installed in parallel on the low-voltage distribution system or DC power supply system to be protected, and provide common and different modes of protection. Its installation location is recommended to be located at the front end of the household side of the distribution system or at both ends of the DC power line (solar panel side and inverter/converter side), and equipped with matching circuit breakers or fuses
Product Features
1.T2, T1+T2 surge protection devices are available for photovoltaic/low-voltage power system.
2. Module design, easy installation, and replaceable.
3. The color of the visible window indicates the running status, green indicates normal, and red indicates abnormal.
4. No leakage, no working current.
5. Remote signal or intelligent monitoring module (optional).
Product Parameters
Test standards | EN/IEC61643-11(Type 1 /Class 1/T1) | |||||
Maximum operating voltage(Ac)Uc | 280V | |||||
Lightning impulse current (10/350 µs) (Iimp) | 50kA | 320V | 385V | 440V | 600V | NPE:255V |
Total lighting current(10/350 µs)L1/N→PE Itoal | 1P:50kA,2P:100kA,3P:150kA,4P:200kA, | |||||
Voltage Protection Level Up | ≤1.5kV | |||||
Response time ta | <100ns | ≤1.6kV | ≤1.8kV | ≤3.6kV | ≤4.6kV | ≤1.5kV |
Degree of protection | IP20 | |||||
Range of operating temperatures | -40ºC~+80ºC | |||||
Failure indication | Green:normal Red:invalid | |||||
Approvals,certification | TUV/CB/CE/IEC/ROHS | |||||
Pole | 1P/2P/3P/4P/1P+N/3P+N | |||||
Remote signal interface connection capability | Available | |||||
Protection Class | IP20 |
FAQ:
Q:How to purchase?
A:Reach out to us with your inquiry → provide drawings, requirements, and customization needs → inform us of your usage scenarios → receive our expert product design suggestions → negotiate details → confirm sample → sign contract/deposit → mass production → goods ready → balance payment/delivery → initiate further cooperation.
Q:What's the delicery time?
A:Usually it will take 1-3 weeks for production according to the quantity.
Q: How is your technical support?
A: We provide online service through Email. Any problem after delivery, we will offer you video call anytime, our engineer will also go to oversea help our customers if necessary.